THE GLOBAL EDITION 01
English
Map of 2 power-plant records in Barbados, coloured by fuel and sized by reported capacity where available
← Country directoryBRB / COUNTRY PROFILE

Power plants in Barbados

2 power-plant records · Capacity not reported

  • Oil 50%
  • Solar 50%
Explore Barbados on the map

Barbados has 2 power plants in this atlas, with capacity not reported. By number of records the most common technologies are oil and solar. Grid operators listed here include Barbados Light & Power. Electricity is regulated by FTC. Renewables supplied 9% of its electricity in 2024.

Data compiled from official inventories and open sources; see data sources and coverage.

Barbados at a glance

Power-plant records
2
Reported capacity
Capacity not reported
Renewable electricity (2024)
9%
Most records
Oil, Solar
Capital
Bridgetown

Records by technology

Counts records, not generation share · coverage & dates

Reported capacity is the rated size of the listed installations, not electricity being produced now. Source dates and coverage differ, so newer facilities may be absent and historical records may remain.

Grid operators and electricity market in Barbados

Vertically integrated utilityOne utility does everything

Oil-fired plants supply most power, with rapid growth in rooftop solar under a 2030 renewables goal.

  1. GenerationState utility
  2. TransmissionState utility
  3. DistributionState utility
  4. CustomersGovernment-set tariffs

Who regulates

  • FTCEnergy regulator

Who controls the grid

Barbados Light & Power, owned by Emera, runs generation and the grid.

Markets & power exchanges

No power exchange: the utility produces or buys electricity and sells it at set tariffs.

Regional grid

Not part of a larger synchronous grid or regional power pool.

What does “Vertically integrated utility” mean?

A single, usually state-owned utility generates, transmits and distributes electricity. Prices are set or approved by the government or a regulator rather than by a market.

References reviewed 2026-09-29. Logos are each organisation’s own site icon, shown to identify it. Selected organisations, not an exhaustive list of licence holders.

Browse the worldwide operator directory
ELECTRICITY IN 2024

Electricity production in Barbados

Electricity generated1.1 TWh
Renewable share9%
Low-carbon share9%
Carbon intensity594.6 gCO₂e/kWh

Electricity mix 2024

Annual generation by source · terawatt-hours (TWh)

Hydro0 TWh
Wind0 TWh
Solar0.1 TWh
Bioenergy0 TWh
Other renewables0 TWh
Nuclear0 TWh
Coal0 TWh
Gas0.03 TWh
Other fossil0.98 TWh

Missing categories are labelled “No data”. Rounding can cause small differences from the reported total.

Source: Ember (2026), processed by Our World in Data · CC BY 4.0 · Snapshot 24 April 2026. Method & download details.

Barbados electricity generation, fuel mix and annual data

Regional comparisons: Americas electricity production · Caribbean electricity production

Explore trends & country comparisons

Geography and data notes

Barbados is in Caribbean. Its coastal or island geography provides a different setting for electricity infrastructure from inland systems. This profile connects country reference information with the historical station inventory and reported electricity generation.

Capital
Bridgetown
Languages
English
Region
Caribbean

Geographic reference: Countries geographic database (ODbL). Boundaries and names are for orientation; language listings are introductory, not exhaustive. Banner map: Natural Earth boundaries (public domain) with this atlas’s station records.

The source inventory contains 2 records for Barbados. Select a fuel in the map to explore where its stations are located, then open a record to inspect reported capacity and provenance.

Inventory coverage

2 source records. 0 reported operational in their source snapshot; this is not live status.

2 lack an owner/operator; 2 lack a commissioning year.

Coverage, dates & exclusions
THE GENERATION INVENTORY

List of power plants in Barbados

Open country map

Browse 2 source records, ordered by reported capacity. Ownership and operating status describe the source snapshot; they may have changed. Missing information is shown explicitly.

2 matching records · showing 2

MW measures rated capacity, not electricity generated. Records may describe units, installations, projects or whole complexes. Review inventory coverage and licenses. Download this country’s records.