Power StationsWORLDWIDETHE GLOBAL EDITION 01
Map of 3 power plants in Sierra Leone, coloured by fuel and sized by capacity
← Country directorySLE / COUNTRY PROFILE

Power plants in Sierra Leone

3 power-plant records · 126 MW reported capacity

  • Oil 67%
  • Hydro 33%
Explore Sierra Leone on the map

Sierra Leone at a glance

Power-plant records
3
Reported capacity
126 MW
Renewable electricity (2024)
95.2%
Most records
Oil, Hydro
Grid operator
EDSA
Capital
Freetown

Records by technology

Counts records, not generation share · coverage & dates

Reported capacity is the rated size of the listed installations, not electricity being produced now. Source dates and coverage differ, so newer facilities may be absent and historical records may remain.

How electricity works in Sierra Leone

Single buyerOne state buyer, private generators

Bumbuna hydro, a Turkish power ship and diesel supply power.

  1. GenerationState utility + private producers
  2. TransmissionOne state buyer
  3. DistributionUtility networks
  4. CustomersRegulated tariffs

Who regulates

  • EWRCEnergy regulator

Who controls the grid

State-owned EGTC transmits and EDSA distributes.

Markets & power exchanges

No open power exchange: producers sell to the single buyer under long-term contracts.

Regional grid

  • West African Power PoolRegional grid

    Member of the West African Power Pool, the ECOWAS body building interconnectors and a regional electricity market across West Africa.

What does “Single buyer” mean?

Independent power producers build plants and sell their output under long-term contracts to one designated state buyer, usually the national utility, which runs the grid and sells to consumers.

References reviewed 2026-09-29. Logos are each organisation’s own site icon, shown to identify it. Selected organisations, not an exhaustive list of licence holders.

Browse the worldwide operator directory
ELECTRICITY IN 2024

How Sierra Leone generates electricity

Electricity generated0.21 TWh
Renewable share95.2%
Low-carbon share95.2%
Carbon intensity47.6 gCO₂e/kWh

Electricity mix 2024

Annual generation by source · terawatt-hours (TWh)

Hydro0.18 TWh
Wind0 TWh
Solar0.02 TWh
Bioenergy0 TWh
Other renewables0 TWh
Nuclear0 TWh
Coal0 TWh
Gas0 TWh
Other fossil0.01 TWh

Missing categories are labelled “No data”. Rounding can cause small differences from the reported total.

Source: Ember (2026), processed by Our World in Data · CC BY 4.0 · Snapshot 24 April 2026. Method & download details.

Explore trends & country comparisons

Geography and data notes

Sierra Leone is in Western Africa. Its coastal or island geography provides a different setting for electricity infrastructure from inland systems. This profile connects country reference information with the historical station inventory and reported electricity generation.

Capital
Freetown
Languages
English
Region
Western Africa

Geographic reference: Countries geographic database (ODbL). Boundaries and names are for orientation; language listings are introductory, not exhaustive. Banner map: Natural Earth boundaries (public domain) with this atlas’s station records.

The source inventory contains 3 records for Sierra Leone. Select a fuel in the map to explore where its stations are located, then open a record to inspect reported capacity and provenance.

Inventory coverage

3 source records. 0 reported operational in their source snapshot; this is not live status.

2 lack an owner/operator; 3 lack a commissioning year.

Coverage, dates & exclusions
THE GENERATION INVENTORY

List of power plants in Sierra Leone

Open country map

Browse 3 source records, ordered by reported capacity. Ownership and operating status describe the source snapshot; they may have changed. Missing information is shown explicitly.

3 matching records · showing 3

23 MW
Owner in source
Sierra Rutile Limited
Operator in source
Not reported
Commissioned
Not reported
Source status
Operating status unverified
Sierra Rutile · historical recordDetails & map

MW measures rated capacity, not electricity generated. Records may describe units, installations, projects or whole complexes. Review inventory coverage and licenses. Download this country’s records.